   Blind area is designed to protect the foundation from water that accumulates after rain or melting snow. And no matter built cottage or villa - if this is not done around the building from time to time begins to form a swamp, and the fluid will not be discharged into drains. In order to cope with the strengthening of its functions, its width should be about 700 mm (minimum margin from the eaves of the roof - 200 mm or more). Pour it should be around the perimeter of the slope fundamenta.Optimalny - 3-10 degrees.
фундамент - Самое интересное в блогах
Otmostki device should begin with the removal of a thin layer of soil around the buildings during the construction of the house will be completed. First, you must clear the neighborhood accumulated debris, and then remove the 200-250 mm of the soil so as to obtain a bias towards the wall. Deepening fill clay compacted. Clay best solution for device blind area around residential buildings. This moisture and provides a fast her abduction.

   When the layer of clay will be trodden down, set a border around the outer edge of the future blind area. On top put a layer of crushed stone and re-compacted. In this production tie is completed. Can be laid on top of paving slabs, asphalt, or just pour concrete. Overcame great new country house on the perimeter of the foundation, which cobble, shell, gravel or clinker brick.

   There is another embodiment of a blind area when removing soil and after execution of the main layer of sand is filled with liquid glass substrate is otverditelem.Rezultatom coating which looks like sandstone, which gives a certain home peel.

        Expansion joints

   Any blind area should be equipped compensatory seams both along and across. The seasonal variations in temperature observed shifting of the ground, and if the drainage layer will fit snugly to the cap and a year later a gap, which will start to leak water. To eliminate this effect the joints are made, whose width is about 20 mm. The wider the blind area, the more they need to run. So, if we are on a concrete base, cross stitches should go in increments of 2-2.5 m. The optimum materials for "spare" sutures - sealants, bitumen, roofing felt, board, specially treated septic tank.